Skip to main content

Our Projects

Yosemite Slough Restoration and State Park Improvements

Home  /  Projects   /   Yosemite Slough Restoration and State Park Improvements

Goal

The project goal is to restore tidal marsh habitat, improve public access amenities, and extend the SF Bay Trail.

Yosemite Slough is part of the Candlestick Point State Recreation Area, one of the only urban parks in the State Parks system. The project comprises a restored tidal marsh and a new public park which required extensive fundraising efforts led by the California State Parks Foundation.

Completed portions of the project include restoration of 10 acres of tidal marsh habitat, remediation of contaminated soils throughout three acres of wetlands and park land, creation of a new park entrance and public access amenities, and extension of the San Francisco Bay Trail.

 

Approach

WRA managed and led design of the tidal marsh restoration and park improvements, acquired regulatory permits, and conducted biological studies.

For the tidal marsh restoration portion of the project WRA served as the project manager, led the restoration design, and was responsible for the acquisition of regulatory permits. WRA worked with a hydrologist to conduct an analysis of the potential effects of sea-level rise on the project and developed adaptive management strategies to ensure resilience.

WRA staff conducted biological studies and completed jurisdictional determinations for the site for impacts related to the remediation and restoration. Permit applications were prepared for and approved by the U.S. Army Corps of Engineers, Regional Water Quality Control Board, and San Francisco Bay Conservation and Development Commission.

In 2022, construction concluded for the first part of the park improvement phase. WRA served as the lead design consultant for the park improvements which included an improved streetscape and sidewalk, new park entrance, parking area, and San Francisco Bay Trail access.

Impact

Restoration of natural wetland habitat and planning for the first urban state park in California to benefit local residents.

Once Phase I was completed in 2012, the site was transformed from a dilapidated and contaminated site into a fully restored wetland with many new acres of tidal wetlands. The project (North Side Phase I) was recognized by the San Francisco Estuary Partnership’s Outstanding Environmental Projects in 2013.

Full build-out of the park will include a future phase to add an education center building, restroom facilities, central plaza, bay overlook deck, and picnic areas.

Project Specifics

Status

Construction of the restored marsh was completed in 2012. In 2021 construction concluded for the first part of the park improvement phase and WRA staff attended the ribbon cutting ceremony. Full build out of the park will include a second phase in the future and will add an education center building, restroom facilities, central plaza, bay overlook deck, and picnic areas.

Detailed Services

Wetland Habitat Restoration Design
Sea-Level Rise Evaluation
Site Evaluation, Public Outreach Materials
Wetland Delineation, Biological Assessment
Park Master Plan
Public Access Design
Soil Treatability Studies
Construction Estimates and Documents
Environmental Compliance Monitoring
Related Projects

See how we’re making a positive lasting impression.

Coyote Valley MP 2_web crop
Coyote Valley Conservation Area Master Plan
Site visit (4)_web
Sign Hill Open Space Master Plan
Renata Robles and Robin Graham at a site visit at on March 22 2024_web
Carrington Coast Ranch Master Plan
IMG_4867_web
Belmont Open Space Management Plan
Pc Boardwalk at Wetland2_crop web
Camp Tamarancho Bicycle Trails
Site 4 post construction
Galindo Creek Restoration Project
gradient 1
Napa County FEMA Hazard Mitigation Grant Support
PA011260
Novato Fire Protection District Wildfire Safety and Fuels Reduction Planning
20221013_130839
San Francisquito Creek Bank Stabilization
IMG-1392crop
San Dieguito Lagoon “Opportunity Parcels” Restoration Feasibility Studies
IMG_3095 Mount Veeder 16×9
Mount Veeder Post-Fire Restoration
IMG_0845 restored rifle range creek oak knoll
Oak Knoll Mixed-Use Community Development
soquel canyon
Soquel Canyon Mitigation Bank
Picture 220 Recology Yuba EIR Beale Spur
Recology Ostrom Road Projects
Use this photo
Bel Marin Keys Unit V Wetland Restoration
P1221056 livermore smp
City of Livermore Stream Maintenance Program
shutterstock_427366732 river crop
Peaks to People Water Fund
shutterstock_588382160_grove-of-coast-redwood-sequoia-sempervirens-trees-dappled-with-sunlight_crop
Santa Cruz Mountains Carbon Cooperative
Rana-Creek-015-scaled
Rana Creek Ranch Land Monetization Study
Superbloom_WRA_Ishimatsu-13
Young Ranch Ecological Preserve
hafner-vineyard-in-may
Hafner Vineyards Sausal Creek Streambank Repair
zeiss innovation center
ZEISS Innovation Center
SF Embarcadero seawall-1
Port of San Francisco Seawall Program
Taking Action Image from PPT 2
Taking Action to Reduce Wildfire Hazards Initiative
Ridge Top Ranch and Mt Diablo
Ridge Top Ranch Wildlife Conservation Bank
IMG_4584 Napa Sanitary District
Napa Sanitation District Trunk Sewer Rehabilitation and Habitat Enhancement
Encinal Beach
Encinal Beach Dune Restoration and Shoreline Stabilization
DCIM100MEDIADJI_0019.JPG
Dotson Family Marsh Restoration and Public Access Project
corte madera public shore
Corte Madera Ecological Reserve Restoration and Public Access Project
IMG_5054 York Creek Construction
Upper York Creek Ecosystem Restoration and Aquatic Habitat Enhancement
DJI_0068 butte sink
Butte Sink Mitigation Bank Salmonid and Floodplain Habitat Restoration
IMG_0870 brooklyn basin
Brooklyn Basin Redevelopment
Bolinas Lagoon
Bolinas Lagoon Wye Wetlands Restoration Project